Jump to content
WnSoft Forums

jkb

Advanced Members
  • Posts

    1,892
  • Joined

  • Last visited

  • Days Won

    19

Everything posted by jkb

  1. Best wishes to all the team, stay safe Jill
  2. Used files have the file name in bold you may see this easier in the light mode. Jill
  3. Hi Ken, You cannot select multiple clips at once, but if you edit one clip to say shorten it & you need to move all the others up to it Then hold down shift while you drag & all the clips to the right will move along, keeping the synchronisation between them. To attach clips to a specific slide, then click on the slide and right click the audio clip & select link to slide x Good luck with the house move, I moved 3 years ago & still have boxes unpacked with no idea what is in them!! Too busy with other things to get round to sorting them. Jill
  4. If you have the pro version, it is very easy to trim and edit the audio in PTE timeline. If you are doing this in an external editor, then to replace the file go to project options audio tab. Double click the file in the list and navigate to the file you want to replace it with. Jill
  5. Just set it to how many seconds fade you want. Not at the computer at the moment to check, but I think even in the standard version if you overlap two clips in the timeline it will produce an automatic cross-fade. Jill
  6. This is not available in the standard version, only in the Pro version. I had to switch versions to discover this. You can only adjust the volume of the whole sound clip in the Audio tab in the standard version, you can't do it in the Timeline view. With the Trial version & Pro version you can switch between standard & pro in Settings/Preferences If you have purchased the standard version & wish to upgrade to the Pro, then you only have to pay the difference. Jill
  7. If you overlap the two pieces PTE will do a perfect cross-fade. Or put one above the other. With standard version you have to do the fade in, out, in the audio tab. Also to adjust the overall volume of the clip. With the pro version you can adjust the volume dynamically in the timeline view. You can also easily split a track into many parts with the pro version. These two options alone make the pro version worth it. Jill
  8. Paul, a menu is a small exe file that will run other shows or programs. The shows can be exe or video files or you can open another program such as Photoshop, Word etc. They are used when running competitions or by presenters giving talks etc. A TV cannot run this sort of menu as it is an exe file. Jill
  9. R2dee2, add, delete or move your slides in slide view not timeline, it is much easier. You can then use timeline view to fit the slides to the music. You can also use the full screen file list view to quickly select multiple slides in the order you want. Double click on the individual ones you want or single click on one then ctrl click on others and press add (bottom of screen) Jill
  10. The demo is a fully working version & you can easily switch between the standard & pro versions to see the differences. As far as I know there is no restriction on the length of an MP4 other than the capacity of your system. I have recently made a 2 hour show in 2 parts, called from a Menu. Making a Menu to run shows is also very easy. Select a Slide for the Menu, set it to 'Wait for Key Press' In Objects & Animation add Text, image, or button with the name of the show you wish to run. Then under action on mouse click select 'Run Slideshow' or 'Run Application' & navigate to the show you wish to run. With 'Run Slideshow' then both the Menu & called show must be made with exactl the same version of PTE. Jill
  11. Mike, if you have made your show in PTE 10, but need a 32bit exe then just open the PTE project in V9 and create the exe in that. As long as you haven't used any of the new slide style options then the .pte file should open in V9 Or as suggested above make an MP4. If the shows contains heavy animation and/or video then it is better to make an MP4 especially if entering into competitions. Jill
  12. A template is not a workaround. PTE uses a default template for new projects. By creating your own for new projects, then you will always have everything as you want, with no need to go to project options. All you do is file/new and give it a name then or wait until you save to name it. Quick and easy. Jill
  13. jkb

    Nube

    Not yet, but it will do soon. Jill
  14. Fast for me Jill
  15. If you set up a template for new projects with all of the options you want, then you don't need to go into every time you start a new project. Just type in the name and everything else will be set. I very rarely need to go to project options. Jill
  16. A Template is easier and it is also visible from within PTE Also saves space & time as you do not have to unzip. I try to save all of my AV's as a template. I can the copy from my main PC to my laptop & know that all the files are available. Jill
  17. Hi Ian, first question, do the images really have to be in date order? It is usually better to group images according to content and colour as long as they still tell the story. If the images are high Resolution then it may be possible to enlarge the vertical ones and do a slow pan up or down the image, to keep everything the same aspect ratio. But too many pans can be distracting. If you wish to show the whole of the vertical images then as you suggest, placing them side by side can work. Use a suitable full frame image, either slightly blurred or desaturated as a background. This could be the same image throughout the AV to keep continuity, or you could use the preceding image. Don't put the vertical ones full height, just reduce them slightly and maybe add a very thin border and shadow to make them stand out above the background. You could either bring two images up together, Or bring up one then the other. You could also change the background to that of the following image, so that it will easily transition into that. The main aim is to keep the images flowing and avoid distractions. If you live anywhere within travelling distance of Manchester (UK), then we run 1to1 workshops before our regular meetings at Wilmslow Guild AV Group. You are more than welcome to come along. See http://www.wilmslowguildav.org.uk for details. Or see http://www.avnews.org.uk for other AV events. Jill
  18. Thanks for fixing this so quickly
  19. You don't need to go back to PTE9, just publish as an MP4 in PTE10. Sometimes MP4 are bigger than the exe & sometimes a lot smaller. It depends on the content. Download the free VLC Player onto your XP laptop & the MP4 should run without problems. If running your shows from a Menu then use 'Run Application or Open File' & as long as VLC is the default player for MP4 files it will open & play. Jill
  20. If you do this in Timeline, then yes it will overlap the first slide. If they have the same duration then it will appear that it has overwritten the first slide In slide view you can position the cursor on the white part just before the first slide (or just after the last) & PTE will insert the blank in the correct place. Jill
  21. A beginner doesn't, I have just had this exact case. Someone sent in an AV and when I played it I could see that the transitions were jumping rather than flowing smoothly. They sent me a picture of the timeline and I could immediately see the problem with all the red overlaps. As they were brand new to PTE they hadn't realised what the red was. When you know it is easy, but when you don't know it isn't. Jill
  22. because inserting in Timeline depends where you put the pointer & can make slides overlap if the gap between slides is not big enough to insert a new one. Yes I know that you can then adjust the positions but a newcomer to PTE may not realise that there is an overlap - as in this case? I always insert, move or delete in Slide view and use Timeline for adjusting slide duration & transition times. Jill
  23. Good question, I keep trying to get other groups to hold a judging but so far no one else has said yes. If we could get more, then North Wales could be considered as a separate country. Also if Northern Ireland could hold one, that also could be another country. Jill
  24. Thanks, away for a couple of days, will try that next week. Jill
  25. North Wales is the UK judging, Klaus knows that we are just waiting for confirmation of the date. Jill
×
×
  • Create New...