Jump to content
WnSoft Forums

Recommended Posts

Posted

Often, when creating new projects, I open old projects and copy slides from different projects to a new one. I consider it important that you need to copy the slides with the files belonging to the slide into a new project and create a new folder (in the new project). The folder name should contain the name of the old project and the number of the slide to be copied. Permission to copy slides and files can be issued in the settings of the Project or Slide

Posted

The File option Create Backup in ZIP does something like your suggestion, but would require you unzip and open the backup project.

Tom

Posted

Tom95521, you are well aware that this is not at all what I wrote about. I do not need a backup, I need to copy the slides with the files included in them.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...