Jump to content
WnSoft Forums

Changing A Slide's Duration on the Timeline (and shifting everything to the right)


Jimcamel

Recommended Posts

PTE AV Studio 10 - Mac 10.5.2

In the Timeline view, if I select the point between 2 slides and left-click and drag back and forth, the time for the TOTAL of those 2 slides does not change - it just shifts the time between the 2....and I can see this is useful for adjusting the start of the 2nd slide without messing up the rest of the timeline to the right....

But....what if I want to adjust the time such that the whole rest of the timeline to the right increases or decreases magnetically.....how do I do that without doing a Slide Options and typing in the requesting length?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...